Home / Case Studies / Footwear factory · Kazakhstan · military supply

Case study · Footwear factory · Kazakhstan · military supply

Helping a Kazakhstan factory win a military footwear contract — solving cost, capacity and materials

How DOING helped a Kazakhstan factory overcome rising local costs, limited capacity and hard-to-source functional materials — and win a military footwear procurement contract as a long-term supplier.

Services: OEM · Materials sourcing · Production capacity · Quality to spec · Boots

Military
procurement contract won
Cost + capacity
problems solved
Long-term
supply partnership

The challenge

A footwear factory in Kazakhstan bidding to supply the military was squeezed on three fronts: rising local material and labour costs, limited production capacity, and quality that could not consistently meet military requirements. On top of that, some of the special functional materials the boots needed were not available locally, or had to be imported at high cost. They looked to China for a manufacturing partner — and found and contacted us directly through our website.

What we did

  • Re-engineered the cost base with China-based production and sourcing to hit a workable price
  • Provided the production capacity the local factory could not reach on its own
  • Sourced the special functional materials that were unavailable or too expensive locally
  • Brought build quality up to the standard the military specification required

Results

  • Solved the client’s cost, capacity and materials problems together
  • The client won the military procurement contract
  • Became a long-term supplier to the military — an ongoing partnership

Project at a glance

Tell us about your project

Share your category, market and quantity — we’ll reply with real feasibility, lead time and pricing.

Get a Quote
ClientA footwear factory in Kazakhstan
TypeFootwear factory · Kazakhstan · military supply
ServicesOEM · Materials sourcing · Production capacity · Quality to spec
MOQ300–600 pairs/colour · 1,000 pairs/style
Sample lead time2–4 weeks
Production lead time30–60 days
💬